Summary for Test 2022-09-13-55-1
Test performed: ASTM C39-18Project Information
Project Identifiers | Project ID: 209698 DEA: 072332E4 EFIS: 0700000391 COOP: 0705187 |
---|---|
DIST-CO-RTE-PM | 07-LA-I-5-45.4/54 |
Award Date | 07/01/2021 |
Closeout Date | Not set |
Work Description | Addition of 14 miles of HOV lanes in both directions would extend existing carpool lanes on the I- 5 in San Fernando Valley to Santa Clarita Valley |
Location Description | The I-5 North Capacity Enhancements Project focuses on improvements to the I-5 freeway from cities of Santa Clarita and Castaic, beginning at the SR-14 interchange to Parker Rd. |
QA Service Level | 2 (Verified on 02/03/2021) |
Sample Information
Sample Taken Date | 09/13/2022 | Sample Unique Key | 55 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/14/2022 |
Sample type | Quality Control | A brief description of the sample | structural concrete |
The quantity of what the sample constitutes | 2 cylinders | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jose | Last name of sampler or witnessed by | Tellez |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | National Ready Mix | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | S63C451T1 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | S63C451T1 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | RW 2708 | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-09-13-55
DIME Test ID: 2022-09-13-55-1
Testing Lab: Sequoia Consultants
Test Method: ASTM C39-18: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Test Release Date: 2022-12-09
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Calculated
Tester's full name: Javier Lopez
Date of test: 10/11/2022
Average diameter of cylinder 1: 6.00 in
Average diameter of cylinder 2: 6.00 in
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Maximum load on cylinder 1: 105400 lb
Maximum load on cylinder 2: 109790 lb
Type of fracture pattern of cylinder 1: 3
Type of fracture pattern of cylinder 2: 3
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Correction factor for cylinder 2: 1
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 28.27 in^2
Cross sectional area of cylinder 2: 28.27 in^2
Compressive strength (to nearest 10 psi): 3810 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/9/2022 ✔