Summary for Test 2022-11-21-26-1

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 215129
DEA: 050N73U4
EFIS: 0520000166
DIST-CO-RTE-PM05-SB-101-7.3/9.6
Award Date10/22/2020
Closeout Date12/11/2023
Work Description!!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location DescriptionSUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
QA Service Level1 (Verified on 08/24/2020)

Sample Information

Sample Taken Date11/21/2022 Sample Unique Key26
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/21/2022
Sample typeQuality Control A brief description of the sample1x4 concrete aggregates
The quantity of what the sample constitutes1 per batch From where was the sample collectedFabricator
First name of sampler or witnessed byAna Last name of sampler or witnessed byNunnally
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameMartin Marrieta Goleta Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-40-0003
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedbelt cut
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2022-11-21-26
DIME Test ID: 2022-11-21-26-1
Testing Lab: Sequoia Consultants
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-11-29

Test Results


Number of tests: 2
Input Type: Calculated
Tester's full name: Francisco Miranda
Date of test: 11/28/2022
Temperature correction: 0
Temperature of solution: 77
Clay reading (test 1): 5.1
Sand reading (test 1): 4
Clay reading (test 2): 5
Sand reading (test 2): 4
Sand equivalent (test 1): 79
Sand equivalent (test 2): 80
Sand equivalent before temperature correction: 80
Sand equivalent after temperature correction: 80
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/29/2022