Summary for Test 2022-10-28-44-3
Test performed: ASTM D5329-16Project Information
Project Identifiers | Project ID: 993611 DEA: 112N1154 EFIS: 1121000144 |
---|---|
DIST-CO-RTE-PM | 11-IMP-115-R3.2/R8.8,9.5/21.2 |
Award Date | 05/03/2022 |
Closeout Date | 05/02/2023 |
Work Description | ASPHALT RUBBER BINDER CHIP SEAL, PAVEMENT MARKINGS & SHOULDER BACKING. |
Location Description | IMPERIAL COUNTY IN AND NEAR HOLTVILLE FROM ROUTE 115/8 SEPARATION TO TOWLAND ROAD AND FROM WEST JUNCTION EVAN HEWES HIGHWAY TO EAST JUNCTION ROUTE 78/115 |
QA Service Level | 1 (Verified on 03/07/2022) |
Sample Information
Sample Taken Date | 10/28/2022 | Sample Unique Key | 44 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/09/2022 |
Sample type | Department Acceptance | A brief description of the sample | Asphalt Rubber Binder |
The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Contractor | Last name of sampler or witnessed by | Contractor |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Coachella | Transportation Laboratory (TL) Number | C003306 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
---|---|---|---|
Performance Grade | PG 64-16 | Lot number | |
Sublot number | Asphalt Rubber Binder Mix Number |
Test Details
DIME Sample ID: 2022-10-28-44
DIME Test ID: 2022-10-28-44-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2022-11-23
Test Results
Input Type: Calculated
Tester's full name: Sm Ali
Date of test: 11/15/2022
Temperature: 25 C
Final Dial reading (F1): 86 mm
Ball Penetration (P1): 4 mm
Final Dial reading (F2): 87 mm
Ball Penetration (P2): 5 mm
Final Dial reading (F3): 88 mm
Ball Penetration (P3): 4 mm
Resilience 1: 18 %
Resilience 2: 18 %
Resilience 3: 16 %
Average Resilience: 17 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/23/2022 ✔