Summary for Test 2022-10-08-15-2
Test performed: CTM 521-June 2020Project Information
Project Identifiers | Project ID: 993154 DEA: 120R3404 EFIS: 1218000079 |
---|---|
DIST-CO-RTE-PM | 12-ORA-73-12.9/R26.8 |
Award Date | 09/16/2021 |
Closeout Date | 09/28/2023 |
Work Description | REPLACE APPROACH SLABS, JOINT SEAL, AND APPLY METHACRYLATE ON BRIDGES. |
Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS FROM MOULTON PARKWAY UNDERCROSSING IN LAGUNA NIGUEL TO BRISTOL STREET UNDERCROSSING IN COSTA MESA |
QA Service Level | 1 (Verified on 08/02/2021) |
Sample Information
Sample Taken Date | 10/08/2022 | Sample Unique Key | 15 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/10/2022 |
Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 6 concrete cylinders | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Paul | Last name of sampler or witnessed by | Pastora |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 22-0390 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Shortload Mobile Mixers | Transportation Laboratory (TL) Number | 265707 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | CTS-72-EHI |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 1 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | RTE 73 Approach Slabs Br | Where the material sample would have been placed if not sampled | LOC 10 S73 Bristol St Uc Br |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-10-08-15
DIME Test ID: 2022-10-08-15-2
Testing Lab: CT D12 - Huntington Beach Field Laboratory
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2023-03-03
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Calculated
Tester's full name: Dan Morris
Date of test: 11/05/2022
Capped in accordance with?: ASTM C39 - Ground End
Average diameter of cylinder 1: 5.98 in
Average diameter of cylinder 2: 6.01 in
Maximum load on cylinder 1: 161740 lb
Maximum load on cylinder 2: 181760 lb
Type of fracture pattern of cylinder 1: 2
Type of fracture pattern of cylinder 2: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Correction factor for cylinder 2: 1
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 28.08 in^2
Cross sectional area of cylinder 2: 28.36 in^2
Compressive strength (to nearest 10 psi): 6080 psi
General comments (publicly viewable) (Max 1000 characters): @ 28 Days, required = 4000 psi; Complies
Test File Attachments
File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
---|---|---|---|---|---|
22-0390 | 77.46 KB | 11/14/2022 | 2022-10-08-15-2 | Info |
Test was verified on 3/3/2023 ✔