Summary for Test 2022-11-03-47-3
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 215753 DEA: 050N72U4 EFIS: 0520000169 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-4.4/R7.7 |
Award Date | 03/01/2021 |
Closeout Date | Not set |
Work Description | Please cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B. |
Location Description | 101 freeway in Summerland, CA |
QA Service Level | 1 (Verified on 05/06/2021) |
Sample Information
Sample Taken Date | 11/03/2022 | Sample Unique Key | 47 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 11/03/2022 |
Sample type | Quality Assurance | A brief description of the sample | PCC Aggregates |
The quantity of what the sample constitutes | 40 yards | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Tom | Last name of sampler or witnessed by | Cromwell |
Title of sampler | Telephone number of sampler | 8056991626 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Martin Marietta Goleta | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-42-0003 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Stockpile @ Plant | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2022-11-03-47
DIME Test ID: 2022-11-03-47-3
Testing Lab: TRC Companies
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-11-07
Test Results
Number of tests: 1
Input Type: Calculated
Tester's full name: Tom Cromwell
Date of test: 11/03/2022
Temperature correction: 0
Temperature of solution: 73
Clay reading (test 1): 5.4
Sand reading (test 1): 4.1
Sand equivalent (test 1): 76
Sand equivalent before temperature correction: 76
Sand equivalent after temperature correction: 76
General comments (publicly viewable) (Max 1000 characters): Passed Spec.
Test was verified on 11/7/2022 ✔