Summary for Test 2022-10-19-68-4
Test performed: CTM 504-June 2010Project Information
Project Identifiers | Project ID: 215188 DEA: 080F5434 EFIS: 0817000239 Permit Numbers: 0823NMC0369 |
---|---|
DIST-CO-RTE-PM | 08-RIV-I-15,SR-91-6.1-7.6 |
Award Date | 03/11/2020 |
Closeout Date | 06/05/2024 |
Work Description | I-15 ELC: 15/91 Express Lanes Connector Project (ELC) |
Location Description | Junction of I-15 and SR-91 in Corona, CA |
QA Service Level | 1 (Verified on 09/16/2020) |
Sample Information
Sample Taken Date | 10/19/2022 | Sample Unique Key | 68 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/20/2022 |
Sample type | Department Acceptance | A brief description of the sample | Concrete beams |
The quantity of what the sample constitutes | 4 Beams | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Eduardo Gomez / | Last name of sampler or witnessed by | Alberto Pineda-Gonzalez |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 3J02A1,3J02A2,3J02B1,3J02B2 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Cemex, Corona | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 1625994 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 4 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | back of concrete truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-10-19-68
DIME Test ID: 2022-10-19-68-4
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2022-11-04
Test Results
Input Type: Calculated
Tester's full name: Alberto Pineda-Gonzalez
Date of test: 10/19/2022
Air Content: 1.5 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/4/2022 ✔