Summary for Test 2022-10-06-2-2
Test performed: ASTM A934-19Project Information
Project Identifiers | Project ID: 993318 DEA: 11423704 EFIS: 1116000059 |
---|---|
DIST-CO-RTE-PM | 11-SD-8-R31.8/R41.7 |
Award Date | 04/01/2022 |
Closeout Date | Not set |
Work Description | PLACE CRCP, HMA, MGS, AND WATER POLLUTION CONTROL SYSTEM. |
Location Description | SAN DIEGO COUNTY NEAR ALPINE FROM VIEJAS CREEK BRIDGE TO PINE VALLEY CREEK BRIDGE |
QA Service Level | 1 (Verified on 10/27/2021) |
Sample Information
Sample Taken Date | 10/06/2022 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/12/2022 |
Sample type | Quality Assurance | A brief description of the sample | 1.5 inch dowels purple |
The quantity of what the sample constitutes | 404 | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Jacob | Last name of sampler or witnessed by | Garcia |
Title of sampler | QA Inspector | Telephone number of sampler | 3109128014 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Pacific Highway Products | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L169-007-22 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM7 - Epoxy Coated Dowels | Dowel Metal Heat Number | 4400012225 |
---|---|---|---|
Dowel Epoxy Batch Number | 1G09B | Dowel Coating Specification | ASTM A934 |
Dowel Size | 1.5 in | Dowel Coating Color | Purple |
Dowel Manufacturer | Pacific Highway Products | Dowel Coater | Simcote Inc |
Release Number | Quality Assurance Code | ||
Rebar Size (#) |
Test Details
DIME Sample ID: 2022-10-06-2
DIME Test ID: 2022-10-06-2-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: ASTM A934-19: Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars (Holiday Bend)
Test Release Date: 2022-10-18
Test Results
Input Type: Measured
Tester's full name: Steven Paine
Date of test: 10/18/2022
Total Number of Holiday: 0
Total Length: 3
Holidays Per Linear Foot of Bar: 0
Holiday Test Pass/Fail: Pass
Bend Test Pass/Fail: NA
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/18/2022 ✔