Summary for Test 2022-10-06-47-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 215800
DEA: 051N9704
DIST-CO-RTE-PM05-SB-101-8.4/8.8
Award DateNot set
Closeout DateNot set
Work DescriptionTransient Encampment Removal
Location DescriptionSummerand Cliffs
QA Service Level1 (Verified on 06/21/2021)

Sample Information

Sample Taken Date10/06/2022 Sample Unique Key47
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/12/2022
Sample typeQuality Control A brief description of the sample1/2" RHMA-G
The quantity of what the sample constitutesL1SL1 From where was the sample collectedSource
First name of sampler or witnessed byMatthew Last name of sampler or witnessed byRamos
Title of sampler Telephone number of sampler15623219859
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCalportland/rocky cyn Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-40-0013
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedRoadway BR1 10320 to 10550
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2022-10-06-47
DIME Test ID: 2022-10-06-47-1
Testing Lab: CT D05 - Santa Maria Field Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2022-11-01

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Salvador Lopez-Zamora
Date of test: 10/12/2022
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 96 %
Cumulative percent passing the 1/2 in. sieve: 85 %
Cumulative percent passing the 3/8 in. sieve: 76 %
Cumulative percent passing the #4 sieve: 60 %
Cumulative percent passing the #8 sieve: 76 %
Cumulative percent passing the #16 sieve: 56 %
Cumulative percent passing the #30 sieve: 42 %
Cumulative percent passing the #50 sieve: 32 %
Cumulative percent passing the #100 sieve: 23 %
Cumulative percent passing the #200 sieve: 17 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/1/2022