Summary for Test 2022-09-02-70-4
Test performed: CTM TEMP1-16
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Please click this
link
to view the corrected test.
Project Information
Project Identifiers | Project ID: 993208 DEA: 034F38U4 EFIS: 0321000092 |
---|---|
DIST-CO-RTE-PM | 03-YUB-70-16.2/25.8 |
Award Date | 11/04/2021 |
Closeout Date | Not set |
Work Description | WIDEN SHOULDERS AND IMPROVE CLEAR RECOVERY ZONE. |
Location Description | YUBA COUNTY NEAR MARYSVILLE FROM 0.2 MILE NORTH OF LAURELLEN ROAD TO SOUTH HONCUT CREEK BRIDGE |
QA Service Level | 1 (Verified on 09/10/2021) |
Sample Information
Sample Taken Date | 09/02/2022 | Sample Unique Key | 70 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/02/2022 |
Sample type | Quality Control | A brief description of the sample | 4x8 concrete cylinders |
The quantity of what the sample constitutes | Day's Production | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Wilfredo | Last name of sampler or witnessed by | Bucaneg |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Rinker Materials | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | mix5 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 2 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Besser Hopper | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-09-02-70
DIME Test ID: 2022-09-02-70-4
Testing Lab: Rinker Materials
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2022-09-29
Test Results
Input Type: Calculated
Tester's full name: Wilfredo Bucaneg
Date of test: 09/01/2022
Precast Maximum Curing Temperature: 152 °F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/29/2022 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.