Summary for Test 2016-08-29-7-3
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 209384 DEA: 04264094 EFIS: 0400000735 COOP: 042531 |
---|---|
DIST-CO-RTE-PM | 04-,SON-- |
Award Date | 01/21/2016 |
Closeout Date | 06/03/2020 |
Work Description | Not set |
Location Description | Not set |
QA Service Level | 1 (Verified on 06/03/2020) |
Sample Information
Sample Taken Date | 08/29/2016 | Sample Unique Key | 7 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/30/2016 |
Sample type | Quality Assurance | A brief description of the sample | Couplers |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | P | Last name of sampler or witnessed by | Latasa |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Harris Salinas | Transportation Laboratory (TL) Number | C919571 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Nucor |
Coupler Manufacturer | Dextra America | Intermediate Assembler or Fabricator | Unknown |
Rebar Size | 11 | Coupler Model | Bartec |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
Coupler Component Heat/Lot Number(s) | DL14101108 | Rebar Heat Number(s) | SE15104965 |
Rebar Size 2 | Not set | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2016-08-29-7
DIME Test ID: 2016-08-29-7-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2016-08-31
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 08/31/2016
UTM: 400KIP
Halo ID: Small
Temperature: 72 F
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|
1 | 3 | #11/36mm | 1.56 | 0 | 136740 | 87656 | Bar Broke,Ok Necking | Brian |
General comments (publicly viewable) (Max 1000 characters): Bar Broke,Ok Necking
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 8/31/2016 ✔