Summary for Test 2022-04-22-44-4
Test performed: CTM 518-June 2010Project Information
Project Identifiers | Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215-2.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA. |
Location Description | SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING |
QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
Sample Taken Date | 04/22/2022 | Sample Unique Key | 44 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/23/2022 |
Sample type | Quality Control | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 6 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Erik | Last name of sampler or witnessed by | Villalba |
Title of sampler | QC Field Technician | Telephone number of sampler | Unknown |
Laboratory sample identification | Set 1 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Jobsite | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 00-0000 |
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 1611614 |
---|---|---|---|
The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 0 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Set 1 |
A detailed description of where the material sample was collected | NB RTE 215 Washington Ave Overpass, Truck no. 64155 | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2022-04-22-44
DIME Test ID: 2022-04-22-44-4
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2022-09-21
Test Results
Input Type: Calculated
Tester's full name: Erik Villalba
Date of test: 04/22/2022
Unit weight of the concrete: 143.43 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/21/2022 ✔