Summary for Test 2022-04-22-44-3

Test performed: CTM 557-June 2020

Project Information

Project IdentifiersProject ID: 214663
DEA: 081F7304
EFIS: 0815000034
DIST-CO-RTE-PM08-SBD-215-2.7
Award DateNot set
Closeout DateNot set
Work DescriptionREPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA.
Location DescriptionSAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING
QA Service Level1 (Verified on 02/24/2021)

Sample Information

Sample Taken Date04/22/2022 Sample Unique Key44
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/23/2022
Sample typeQuality Control A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes6 From where was the sample collectedJob Site
First name of sampler or witnessed byErik Last name of sampler or witnessed byVillalba
Title of samplerQC Field Technician Telephone number of samplerUnknown
Laboratory sample identificationSet 1 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameJobsite Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifier00-0000
Structure name

Material Information

Material TypeConcrete The concrete mix design number1611614
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedNB RTE 215 Washington Ave Overpass, Truck no. 64155 Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Test Details

DIME Sample ID: 2022-04-22-44
DIME Test ID: 2022-04-22-44-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2022-09-21

Test Results


Input Type: Calculated
Tester's full name: Erik Villalba
Date of test: 04/22/2022
Temperature: 75 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/21/2022