Summary for Test 2022-08-29-53-2
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 993299 DEA: 022J3904 EFIS: 0221000073 |
---|---|
DIST-CO-RTE-PM | 02-SHA-44-45.5/51.6 |
Award Date | 11/16/2021 |
Closeout Date | 11/23/2022 |
Work Description | HMA OVERLAY, REPLACE AC SURFACING AND SHOULDER BACKING. |
Location Description | SHASTA COUNTY NEAR VIOLA FROM 3.0 MILES EAST OF DEER FLAT ROAD TO 0.5 MILE EAST OF BRIDGE CREEK ROAD |
QA Service Level | 1 (Verified on 10/18/2021) |
Sample Information
Sample Taken Date | 08/29/2022 | Sample Unique Key | 53 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/29/2022 |
Sample type | Department Acceptance | A brief description of the sample | 1 bag of Combined RAP |
The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Cindy | Last name of sampler or witnessed by | Bryant |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | D79143B | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Tullis – Northstate Asphalt (Redding, CA) | Transportation Laboratory (TL) Number | 866065 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Northstate Asphalt |
---|---|---|---|
Aggregate Size | 1/2-inch | Aggregate Source | |
RAP Stockpile | Stockpile Size (tons) | ||
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2022-08-29-53
DIME Test ID: 2022-08-29-53-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-09-09
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Arthur Mills
Date of test: 08/31/2022
Test procedure used?: no data
Mass of HMA Sample prior to ignition: 0.0 g
Mass Loss: 0.0 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: no data
Corrected Asphalt Binder Content: 4.93 %
General comments (publicly viewable) (Max 1000 characters): Uncorrected
Test was verified on 9/9/2022 ✔