Summary for Test 2022-09-06-18-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 213598
DEA: 051F75U4
EFIS: 0518000092
DIST-CO-RTE-PM05-MON-101-R36.9/47.7
Award Date01/16/2019
Closeout Date01/11/2024
Work DescriptionCRCP, SEISMIC RETROFIT, BRIDGE WIDENING AND MEDIAN BARRIER
Location DescriptionMONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE
QA Service Level1 (Verified on 10/11/2018)

Sample Information

Sample Taken Date09/06/2022 Sample Unique Key18
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/06/2022
Sample typeQuality Assurance A brief description of the sampleOHL - 1.5" LCB Aggs
The quantity of what the sample constitutes500 cy From where was the sample collectedSource
First name of sampler or witnessed bySalvador Last name of sampler or witnessed byZepeda
Title of samplerContract Tester Telephone number of sampler559-473-8770
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameOHL - Stockpile LCB Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)n/a
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedOff the feed belt headed into the hopper.
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1-1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2022-09-06-18
DIME Test ID: 2022-09-06-18-1
Testing Lab: CT D05 - Big Sur Field Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2022-09-07

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Salvador Zepeda
Date of test: 09/06/2022
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 96 %
Cumulative percent passing the 1 in. sieve: 89 %
Cumulative percent passing the 3/4 in. sieve: 81 %
Cumulative percent passing the 1/2 in. sieve: 62 %
Cumulative percent passing the 3/8 in. sieve: 52 %
Cumulative percent passing the #4 sieve: 31 %
Cumulative percent passing the #8 sieve: 79 %
Cumulative percent passing the #16 sieve: 67 %
Cumulative percent passing the #30 sieve: 57 %
Cumulative percent passing the #50 sieve: 42 %
Cumulative percent passing the #100 sieve: 23 %
Cumulative percent passing the #200 sieve: 15 %
General comments (publicly viewable) (Max 1000 characters): Pass

Test was verified on 9/7/2022