Summary for Test 2022-08-15-44-2
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 209698 DEA: 072332E4 EFIS: 0700000391 COOP: 0705187 |
---|---|
DIST-CO-RTE-PM | 07-LA-I-5-45.4/54 |
Award Date | 07/01/2021 |
Closeout Date | Not set |
Work Description | Addition of 14 miles of HOV lanes in both directions would extend existing carpool lanes on the I- 5 in San Fernando Valley to Santa Clarita Valley |
Location Description | The I-5 North Capacity Enhancements Project focuses on improvements to the I-5 freeway from cities of Santa Clarita and Castaic, beginning at the SR-14 interchange to Parker Rd. |
QA Service Level | 2 (Verified on 02/03/2021) |
Sample Information
Sample Taken Date | 08/15/2022 | Sample Unique Key | 44 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/17/2022 |
Sample type | Department Acceptance | A brief description of the sample | Class 3 Aggregate Base |
The quantity of what the sample constitutes | NA | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jose | Last name of sampler or witnessed by | Tellez |
Title of sampler | S2 Technician | Telephone number of sampler | |
Laboratory sample identification | 22-0233 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | NA | Transportation Laboratory (TL) Number | 2202-08-15-01 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | NA |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Median | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2022-08-15-44
DIME Test ID: 2022-08-15-44-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-09-01
Test Results
Number of tests: 1
Input Type: Measured
Tester's full name: James Lee/Arnold Truong
Date of test: 08/19/2022
Temperature correction: 0
Temperature of solution: 75
Clay reading (test 1): 5.3
Sand reading (test 1): 3.3
Sand equivalent (test 1): 63
Sand equivalent before temperature correction: 63
Sand equivalent after temperature correction: 63
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/1/2022 ✔