Summary for Test 2022-07-25-75-4

Test performed: CTM TEMP1-16
Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only. Please click this link to view the corrected test.

Project Information

Project IdentifiersProject ID: 993121
DEA: 032H62U4
EFIS: 0319000021
DIST-CO-RTE-PM03-NEV-20-25.6/39.8
Award Date02/08/2022
Closeout DateNot set
Work DescriptionROADWAY EXCAVATION, HMA (TYPE A) WITH CLASS 2 AB, RCB CULVERT AND RCP.
Location DescriptionNEVADA COUNTY NEAR OMEGA AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF CONSERVATION ROAD (WASHINGTON RIDGE ROAD) TO 1.2 MILES WEST OF ZEIBRIGHT ROAD
QA Service Level1 (Verified on 07/26/2021)

Sample Information

Sample Taken Date07/25/2022 Sample Unique Key75
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/25/2011
Sample typeQuality Control A brief description of the sample4x8 concrete cylinders
The quantity of what the sample constitutesDay's production From where was the sample collectedManufacturer
First name of sampler or witnessed byWilfredo Last name of sampler or witnessed byBucaneg
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameRinker Materials Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numbermix5
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected3
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedPipePro Hopper Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2022-07-25-75
DIME Test ID: 2022-07-25-75-4
Testing Lab: Rinker Materials
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2022-08-29

Test Results


Input Type: Calculated
Tester's full name: Wilfredo Bucaneg
Date of test: 07/25/2022
Precast Maximum Curing Temperature: 103 °F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/29/2022

Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only.