Summary for Test 2022-08-29-12-1
Test performed: CTM 231-March 2013
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Please click this
link
to view the corrected test.
Project Information
Project Identifiers | Project ID: 213598 DEA: 051F75U4 EFIS: 0518000092 |
---|---|
DIST-CO-RTE-PM | 05-MON-101-R36.9/47.7 |
Award Date | 01/16/2019 |
Closeout Date | 01/11/2024 |
Work Description | CRCP, SEISMIC RETROFIT, BRIDGE WIDENING AND MEDIAN BARRIER |
Location Description | MONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE |
QA Service Level | 1 (Verified on 10/11/2018) |
Sample Information
Sample Taken Date | 08/29/2022 | Sample Unique Key | 12 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/29/2022 |
Sample type | Quality Assurance | A brief description of the sample | Native Subgrade |
The quantity of what the sample constitutes | 665 sy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Salvador | Last name of sampler or witnessed by | Zepeda |
Title of sampler | Contract Tester | Telephone number of sampler | 559-473-8770 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Native Material | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Jobsite - Native SubGrade | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-08-29-12
DIME Test ID: 2022-08-29-12-1
Testing Lab: CT D05 - Big Sur Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-08-29
Test Results
Method Type:: Standard Count
Number of Tests:: 1
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Mathew Spencer
Date of test: 08/29/2022
Sum of Count or Density: 3680.00 g/cc
Average of Count or Density: 1226.67 g/cc
Sum of Moisture Count: 633.00 g/cc
Average of Moisture Count: 211.00 g/cc
Count Ratio Density: 2.02
Count Ratio Moisture: 2.12
Calculated Percent Relative Compaction: 95.3 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters): Pass
Test was verified on 8/29/2022 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.