Summary for Test 2022-08-22-45-1

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 215367
DEA: 021J4904
EFIS: 0220000084
DIST-CO-RTE-PM02-TEH-32-14.0/20.0
Award Date02/02/2021
Closeout Date04/11/2024
Work DescriptionPLACE HOT MIX ASPHALT (TYPE A).
Location DescriptionTEHAMA COUNTY ABOUT 28 MILES EAST OF FOREST RANCH FROM 1.1 MILES EAST OF DEER CREEK BRIDGE NO. 08-0068 TO 0.4 MILE WEST OF SLATE CREEK BRIDGE NO. 08-0154
QA Service Level1 (Verified on 12/24/2020)

Sample Information

Sample Taken Date08/22/2022 Sample Unique Key45
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/24/2022
Sample typeAcceptance A brief description of the sample4 boxes of Lime Treated 1/2-inch Type A HMA with 24.0% RAP and virgin PG 58-22 from Albina – Klamath Falls
The quantity of what the sample constitutes750 tons From where was the sample collectedJob Site
First name of sampler or witnessed byRyan Last name of sampler or witnessed bySturges
Title of samplerPEI Telephone number of sampler
Laboratory sample identificationD79139 Linked DIME Sample ID
The fabricator/manufacturer/facility nameDig It Construction – Sierra Cascade Aggregate and Asphalt Products (Chester, CA) Transportation Laboratory (TL) Number876985
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading1/2 inch Lot number
Sublot number HMA Mix NumberNot set

Test Details

DIME Sample ID: 2022-08-22-45
DIME Test ID: 2022-08-22-45-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-08-26

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Khue Yang and Arthur Mills
Date of test: 08/25/2022
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.36 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.88 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/26/2022