Summary for Test 2022-02-24-32-1
Test performed: AASHTO T336-15Project Information
Project Identifiers | Project ID: 214951 DEA: 120K0234 EFIS: 1214000100 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-17.1/18.9 |
Award Date | 09/23/2020 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 3 - El Toro/Alicia) WIDEN FREEWAY AND BRIDGES, RECONSTRUCT BRIDGE AND WALLS. |
Location Description | ORANGE COUNTY IN MISSION VIEJO, LAGUNA HILLS, LAGUNA WOODS AND LAKE FOREST FROM 0.4 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING TO 0.2 MILE NORTH OF EL TORO ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 10/01/2020) |
Sample Information
Sample Taken Date | 02/24/2022 | Sample Unique Key | 32 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 02/25/2022 |
Sample type | Quality Control | A brief description of the sample | JPCP Field Qualification |
The quantity of what the sample constitutes | 65 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Brandon | Last name of sampler or witnessed by | Schroeder |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | W01-22-04040-C1 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Twining | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 3F5FL001 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 108157490 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | I-5 SB Alicia Parkway | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-02-24-32
DIME Test ID: 2022-02-24-32-1
Testing Lab: Atkinson Construction
Test Method: AASHTO T336-15: Standard Method of Test for Coefficient of Thermal Expansion of Hydraulic Cement Concrete
Test Release Date: 2022-08-24
Test Results
Input Type: Calculated
Tester's full name: Mark Torres
Date of test: 03/31/2022
Average CTE: .00000884 mm/mm/°C
Average CTE: 4.913E-6 in/in/°F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/24/2022 ✔