Summary for Test 2022-08-15-33-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 993697 DEA: 022J4504 |
---|---|
DIST-CO-RTE-PM | 02-TEH-36-56.0/R60.5 |
Award Date | 06/09/2022 |
Closeout Date | 10/06/2022 |
Work Description | PLACE HMA (TYPE A) AND REPLACE AC SURFACING. |
Location Description | TEHAMA COUNTY ABOUT 13 MILES EAST OF RED BLUFF FROM 0.7 MILE EAST OF MANTON ROAD TO 2.4 MILES EAST OF PAYNES CREEK BRIDGE |
QA Service Level | 1 (Verified on 04/05/2022) |
Sample Information
Sample Taken Date | 08/15/2022 | Sample Unique Key | 33 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/15/2022 |
Sample type | Department Acceptance | A brief description of the sample | 1 bag of Combined RAP (1/2-inch) |
The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | JD | Last name of sampler or witnessed by | . |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | D79129B | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Knife River Construction – Orland Plant (Orland, CA) | Transportation Laboratory (TL) Number | 857903 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | KRC Orland |
---|---|---|---|
Aggregate Size | 1/2-inch | Aggregate Source | |
RAP Stockpile | Stockpile Size (tons) | ||
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2022-08-15-33
DIME Test ID: 2022-08-15-33-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-08-22
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Karen Rios Dorado
Date of test: 08/17/2022
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.40 %
General comments (publicly viewable) (Max 1000 characters): Uncorrected.
Test was verified on 8/22/2022 ✔