Summary for Test 2022-07-29-34-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 993847 DEA: 081M8604 EFIS: 0822000056 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15-180.2/186.2 |
Award Date | 06/23/2022 |
Closeout Date | 12/12/2022 |
Work Description | COLD PLANE AC PAVEMENT AND PLACE RUBBERIZED HMA (GAP GRADED). |
Location Description | SAN BERNARDINO COUNTY ABOUT 43 MILES NORTH OF BAKER FROM 0.5 MILE SOUTH OF YATES WELL ROAD OVERCROSSING TO NEVADA STATE LINE |
QA Service Level | 1 (Verified on 12/05/2022) |
Sample Information
Sample Taken Date | 07/29/2022 | Sample Unique Key | 34 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/09/2022 |
Sample type | Department Acceptance | A brief description of the sample | Urgent - High profile job |
The quantity of what the sample constitutes | 3 cans | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Scott | Last name of sampler or witnessed by | Watkins |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Southwest Liquid Asphalt & Emulsions | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 76-22 M |
---|---|---|---|
Modified | Yes | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | AASHTO Resource - Frederick MD | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2022-07-29-34
DIME Test ID: 2022-07-29-34-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2022-08-10
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 08/09/2022
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.995 grams
Mass of empty container #2: 169.465 grams
Mass of container #1 before test (m1i): 204.945 grams
Mass of container #2 before test (m2i): 204.717 grams
Mass of container #1 after test (m1f): 204.831 grams
Mass of container #2 after test (m2f): 204.602 grams
Average mass change: -0.317 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change
Test was verified on 8/10/2022 ✔