Summary for Test 2022-07-09-9-2
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 993162 DEA: 07319104 EFIS: 0716000017 |
---|---|
DIST-CO-RTE-PM | 07-LA-91-R11.8 |
Award Date | 02/10/2022 |
Closeout Date | 01/11/2024 |
Work Description | ADJUST VERTICAL CLEARANCE WITH ROADWAY EXCAVATION AND PLACE JPCP. |
Location Description | LOS ANGELES COUNTY IN LONG BEACH AT NORTHBOUND ROUTE 710 TO EASTBOUND ROUTE 91 CONNECTOR |
QA Service Level | 1 (Verified on 11/30/2021) |
Sample Information
Sample Taken Date | 07/09/2022 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/09/2022 |
Sample type | Quality Assurance | A brief description of the sample | Class 3 Aggregate Base |
The quantity of what the sample constitutes | 10,600 Sq. Ft. | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Ali | Last name of sampler or witnessed by | Rehman |
Title of sampler | Field Materials Tester | Telephone number of sampler | 7148753445 |
Laboratory sample identification | 22-1724 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Class 3 Aggregate Base | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | In-placed material | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-07-09-9
DIME Test ID: 2022-07-09-9-2
Testing Lab: Kleinfelder, Incorporated - Los Angeles
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-07-11
Test Results
Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Ali Rehman
Date of test: 07/09/2022
Sum of Count or Density: no data
Average of Count or Density: no data
Sum of Moisture Count: no data
Average of Moisture Count: no data
Count Ratio Density: no data
Count Ratio Moisture: no data
Calculated Percent Relative Compaction: 97.7 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters): In-place wet density of 2.12 vs maximum wet density of 2.17.
Test was verified on 7/11/2022 ✔