Summary for Test 2022-06-16-59-1
Test performed: ASTM C143-20Project Information
Project Identifiers | Project ID: 214114 DEA: 040A5394 EFIS: 0418000244 |
---|---|
DIST-CO-RTE-PM | 04-SOL-80,12-11.4/12.8, 2.1/2.8 |
Award Date | Not set |
Closeout Date | 02/24/2023 |
Work Description | Widen EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc. |
Location Description | I-80/I-680/Route 12 Interchange |
QA Service Level | 1 (Verified on 04/23/2019) |
Sample Information
Sample Taken Date | 06/16/2022 | Sample Unique Key | 59 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/16/2022 |
Sample type | Quality Control | A brief description of the sample | Concrete |
The quantity of what the sample constitutes | 100 CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Nicole | Last name of sampler or witnessed by | Marcal |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Syar | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 1615674 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 30297744 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Drainage system 13U inlet | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-06-16-59
DIME Test ID: 2022-06-16-59-1
Testing Lab: RMA Group - Rancho Cordova
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2022-07-07
Test Results
Input Type: Calculated
Tester's full name: Nicole Marcal
Date of test: 06/16/2022
Slump: 3.75 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/7/2022 ✔