Summary for Test 2022-05-11-61-2
Test performed: CTM 227-December 2014Project Information
Project Identifiers | Project ID: 215231 DEA: 042A3324 EFIS: 0414000039 |
---|---|
DIST-CO-RTE-PM | 04-ALA-84-10.8/18 |
Award Date | 02/22/2021 |
Closeout Date | 02/29/2024 |
Work Description | NILES CANYON SAFETY PROJECT |
Location Description | ALAMEDA CREEK BR OH (33-0034) BRIDGE RAIL REPLACEMENT, 2,060 LF; AND STONYBROOK CREEK BRIDGE (SLAB BRIDGE) |
QA Service Level | 1 (Verified on 10/19/2020) |
Sample Information
Sample Taken Date | 05/11/2022 | Sample Unique Key | 61 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/11/2022 |
Sample type | Quality Control | A brief description of the sample | 1 x 4 PCC Aggregate |
The quantity of what the sample constitutes | 100 cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Nicole | Last name of sampler or witnessed by | Marcal |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Central Ready Mix | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Central Concrete |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | No Information | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
The concrete mix design number | X80CC5T2 | Lot number | |
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2022-05-11-61
DIME Test ID: 2022-05-11-61-2
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 227-December 2014: Method of Test for Evaluating Cleanness of Coarse Aggregate (Cleanness)
Test Release Date: 2022-07-01
Test Results
Describe the gradation of the aggregate or the test method:: All aggregate is the same size
Input Type: Calculated
Tester's full name: Todd Strait
Date of test: 05/12/2022
Cleanness value (single primary size): 77
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/1/2022 ✔