Summary for Test 2022-06-17-19-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 993387
DEA: 07323404
EFIS: 0716000064
DIST-CO-RTE-PM07-LA-5-R59.5/R67.9
Award DateNot set
Closeout DateNot set
Work DescriptionPLACE CULVERT, REPLACE DRAINAGE SYSTEM, RECONST ROADWAY & EMBANKMENT.
Location DescriptionLOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM LAKE HUGHES ROAD UNDERCROSSING TO 1.9 MILES NORTH OF TEMPLIN HIGHWAY UNDERCROSSING
QA Service Level1 (Verified on 12/06/2021)

Sample Information

Sample Taken Date06/17/2022 Sample Unique Key19
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/21/2022
Sample typeVerification A brief description of the sampleLCB Aggregate
The quantity of what the sample constitutesLCB-RS Mix Qualification From where was the sample collectedSource
First name of sampler or witnessed byMD Last name of sampler or witnessed byShahjahan
Title of samplerMREA Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSecurity Paving Company Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)LCB - Recycled
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2022-06-17-19
DIME Test ID: 2022-06-17-19-1
Testing Lab: CT D07 - Plant Services
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2022-07-13

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Avo Karajian
Date of test: 06/21/2022
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 97 %
Cumulative percent passing the 1/2 in. sieve: 81 %
Cumulative percent passing the 3/8 in. sieve: 72 %
Cumulative percent passing the #4 sieve: 37 %
Cumulative percent passing the #8 sieve: 27 %
Cumulative percent passing the #16 sieve: 21 %
Cumulative percent passing the #30 sieve: 15 %
Cumulative percent passing the #50 sieve: 10 %
Cumulative percent passing the #100 sieve: 7 %
Cumulative percent passing the #200 sieve: 5.4 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/13/2022