Summary for Test 2022-04-19-55-1
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
---|---|
DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
Award Date | 05/27/2016 |
Closeout Date | 08/01/2023 |
Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
Sample Taken Date | 04/19/2022 | Sample Unique Key | 55 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 04/20/2022 |
Sample type | Department Acceptance | A brief description of the sample | Coarse and fine aggregate |
The quantity of what the sample constitutes | Three Bags | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Baher | Last name of sampler or witnessed by | Fakhoury |
Title of sampler | Telephone number of sampler | 2137937180 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Security Paving batch plant | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0025 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Conveyor Belt | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | G3-19-PCC-001 | Lot number | |
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2022-04-19-55
DIME Test ID: 2022-04-19-55-1
Testing Lab: CT D07 - Plant Services
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2022-06-02
Test Results
What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Measured
Tester's full name: Baher Fakhoury
Date of test: 05/02/2022
Cumulative Mass Retained | Cumulative Percent Passing | |||||
---|---|---|---|---|---|---|
10187 grams | ||||||
0 grams | 100 % | |||||
496 grams | 95 % | |||||
3234 grams | 68 % | |||||
8461 grams | 17 % | |||||
9661 grams | 5 % | |||||
10095 grams | 1 % | |||||
10117 grams | 1 % | |||||
10187 grams |
General comments (publicly viewable) (Max 1000 characters): Sample # 1 was taken @ 200 CY at 8:00 am
Test was verified on 6/2/2022 ✔