Summary for Test 2022-05-12-45-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 993239 DEA: 100P5404 EFIS: 1013000251 |
---|---|
DIST-CO-RTE-PM | 10-SJ,STA-5,99-6.2/6.6,R17.7/R18.1 |
Award Date | 10/29/2021 |
Closeout Date | 08/30/2023 |
Work Description | REMOVE & PLACE STRUCTURAL CONCRETE BRIDGE; AND PLACE CONCRETE BARRIER. |
Location Description | SAN JOAQUIN AND STANISLAUS COUNTIES ON ROUTE 5 FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF ROUTE 5/33 SEPARATION AND OVERHEAD AND ON ROUTE 99 FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF WEST MODESTO OVERHEAD |
QA Service Level | 1 (Verified on 09/27/2021) |
Sample Information
Sample Taken Date | 05/12/2022 | Sample Unique Key | 45 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/20/2022 |
Sample type | Quality Assurance | A brief description of the sample | 3/4 HMA |
The quantity of what the sample constitutes | 2 boxs | From where was the sample collected | Job Site |
First name of sampler or witnessed by | T | Last name of sampler or witnessed by | Nixon |
Title of sampler | tech | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Teichert Vernalis | Transportation Laboratory (TL) Number | 994228 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | 1 | Structure unique identifier | |
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | 1 |
Sublot number | 1 | HMA Mix Number | Not set |
Test Details
DIME Sample ID: 2022-05-12-45
DIME Test ID: 2022-05-12-45-1
Testing Lab: CT D10 - District 10 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-04-19
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Manpreet Singh
Date of test: 05/24/2022
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.97 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.84 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/19/2023 ✔