Summary for Test 2022-03-10-22-2
Test performed: ASTM D2419-09Project Information
Project Identifiers | Project ID: 214819 DEA: 07288304 EFIS: 0700021024 |
---|---|
DIST-CO-RTE-PM | 07-LA-60,60,164,210-Var |
Award Date | 03/01/2021 |
Closeout Date | 10/02/2023 |
Work Description | STORM WATER MITIGATION |
Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 06/30/2021) |
Sample Information
Sample Taken Date | 03/10/2022 | Sample Unique Key | 22 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 03/11/2022 |
Sample type | Department Acceptance | A brief description of the sample | 1 x 4 PCC Aggregate |
The quantity of what the sample constitutes | 100 | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Honesto | Last name of sampler or witnessed by | Castillo |
Title of sampler | Telephone number of sampler | 12134537563 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Robertsons Ready Mix Concrete-Irwindale | Transportation Laboratory (TL) Number | C-006557 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | 6068 | Structure unique identifier | |
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | SMARA 91-33-0061 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | LCB | The fabricator/manufacturer designation for the sample | SC270N31 |
The plant number | 13 | A detailed description of where the material sample was collected | Belt Cut at Plant |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | SC270N31 | Lot number | |
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2022-03-10-22
DIME Test ID: 2022-03-10-22-2
Testing Lab: CT D07 - Plant Services
Test Method: ASTM D2419-09: Standard Test Method for Sand Equivalent Value of Soils and Fine Aggregate
Test Release Date: 2022-05-24
Test Results
How many times will the test be run?: Once
Input Type: Measured
Tester's full name: M. Tarafder
Date of test: 03/17/2022
Clay Level: 4.6
Sand Level: 4.3
Sand Equivalent: 93
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/24/2022 ✔