Summary for Test 2022-05-12-1-2

Test performed: AASHTO T176-08

Project Information

Project IdentifiersProject ID: 993234
DEA: 051H0004
EFIS: 0516000011
DIST-CO-RTE-PM05-MON-68-1.1/L4.3
Award Date10/26/2021
Closeout Date12/14/2023
Work DescriptionPLACE HMA AND MODIFY SIGNAL AND LIGHTING SYSTEMS.
Location DescriptionMONTEREY COUNTY IN AND NEAR PACIFIC GROVE AND MONTEREY FROM FOREST AVENUE TO ROUTE 68/1 SEPARATION
QA Service Level1 (Verified on 10/06/2021)

Sample Information

Sample Taken Date05/12/2022 Sample Unique Key1
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/12/2022
Sample typeAcceptance A brief description of the sample3/4" Combined aggregate
The quantity of what the sample constitutesPSU From where was the sample collectedFabricator
First name of sampler or witnessed byJerrod Last name of sampler or witnessed byNaval
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID2022-05-11-8
The fabricator/manufacturer/facility nameGraniterock Aromas Drum Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form956417 Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-35-0012
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedCold feed line
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number1
Sublot number1 Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2022-05-12-1
DIME Test ID: 2022-05-12-1-2
Testing Lab: CT D05 - Monterey Construction Field Laboratory
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2022-05-12

Test Results


How many times will the test be run?: Once
Input Type: Calculated
Tester's full name: Wesley Rider
Date of test: 05/11/2022
Sand Equivalent: 76
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/12/2022