Summary for Test 2021-12-15-10-2
Test performed: CTM 214-August 2010Project Information
Project Identifiers | Project ID: 215231 DEA: 042A3324 EFIS: 0414000039 |
---|---|
DIST-CO-RTE-PM | 04-ALA-84-10.8/18 |
Award Date | 02/22/2021 |
Closeout Date | 02/29/2024 |
Work Description | NILES CANYON SAFETY PROJECT |
Location Description | ALAMEDA CREEK BR OH (33-0034) BRIDGE RAIL REPLACEMENT, 2,060 LF; AND STONYBROOK CREEK BRIDGE (SLAB BRIDGE) |
QA Service Level | 1 (Verified on 10/19/2020) |
Sample Information
Sample Taken Date | 12/15/2021 | Sample Unique Key | 10 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/22/2022 |
Sample type | Annual Source Testing | A brief description of the sample | Fine Aggregate |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Source |
First name of sampler or witnessed by | D | Last name of sampler or witnessed by | Yeung |
Title of sampler | TED | Telephone number of sampler | |
Laboratory sample identification | 22-PCCF-0048 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Desilva Gates Sunol | Transportation Laboratory (TL) Number | C726253 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-01-0007 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Stock Piles | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | fine | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2021-12-15-10
DIME Test ID: 2021-12-15-10-2
Testing Lab: CT HQ - Sacramento Aggregate Testing Laboratory
Test Method: CTM 214-August 2010: Method of Test for Soundness of Aggregates by Use of Sodium Sulfate
Test Release Date: 2022-05-02
Test Results
What size aggregate is being tested?: Fine Aggregate
Input Type: Calculated
Tester's full name: Ryan Kester/ Jay Horton
Date of test: 04/14/2022
Percentage Loss of material retained on #8 sieve: no data
Percentage Loss of material retained on #16 sieve: no data
Percentage Loss of material retained on #30 sieve: no data
Percentage Loss of material retained on #50 sieve: no data
Percentage Loss of material retained on #100 sieve: no data
Weighted Average Percent Loss of Fine Aggregate: 3.5 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/2/2022 ✔