Summary for Test 2022-04-26-5-1
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 99999 DEA: 0322222 |
---|---|
DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
QA Service Level | (Verified on 04/05/2013) |
Sample Information
Sample Taken Date | 04/26/2022 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 04/26/2022 |
Sample type | Aggregate Prequalification Program | A brief description of the sample | 1" x No. 4 |
The quantity of what the sample constitutes | Stockpile | From where was the sample collected | Source |
First name of sampler or witnessed by | John | Last name of sampler or witnessed by | O'Mara |
Title of sampler | Sampler | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | jomara fabricator | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA or name of Pit) | XX-XX-XXXX |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Stockpile @ Yard | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2022-04-26-5
DIME Test ID: 2022-04-26-5-1
Testing Lab: CT HQ - Sacramento Aggregate Testing Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2022-04-26
Test Results
What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: John OMara
Date of test: 04/27/2022
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 84 %
Cumulative percent passing the 1/2 in. sieve: 28 %
Cumulative percent passing the 3/8 in. sieve: 6 %
Cumulative percent passing the #4 sieve: 1 %
Cumulative percent passing the #8 sieve: 1 %
General comments (publicly viewable) (Max 1000 characters): Test Example
Test was verified on 4/26/2022 ✔