Summary for Test 2022-04-13-29-2
Test performed: ASTM C143-20Project Information
Project Identifiers | Project ID: 214681 DEA: 021H5104 EFIS: 0216000148 |
---|---|
DIST-CO-RTE-PM | 02-TEH-99-9.0/9.3 |
Award Date | 11/04/2021 |
Closeout Date | 08/14/2023 |
Work Description | CHAMPLIN SLOUGH |
Location Description | REPLACE BRIDGE IN TEHAMA COUNTY NEAR LOS MOLINOS FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF CHAMPLIN SLOUGH |
QA Service Level | 1 (Verified on 03/02/2020) |
Sample Information
Sample Taken Date | 04/13/2022 | Sample Unique Key | 29 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/14/2022 |
Sample type | Quality Control | A brief description of the sample | 1 cubic ft. of Concrete taken from middle of batching |
The quantity of what the sample constitutes | 1 cubic ft. of Concrete for Testing | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Mark Patrick | Last name of sampler or witnessed by | Baddu |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Con-Fab California, LLC | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | VER-80LV |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 4832 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Bed 1A, Middle of 3rdTruck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-04-13-29
DIME Test ID: 2022-04-13-29-2
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2022-04-19
Test Results
Input Type: Calculated
Tester's full name: Abraham Luna
Date of test: 04/14/2022
Slump: 22 inch
General comments (publicly viewable) (Max 1000 characters): Flow: 22"
VSI: 0
Test was verified on 4/19/2022 ✔