Summary for Test 2022-04-12-10-1
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 215744 DEA: 033H93U4 EFIS: 0321000091 |
---|---|
DIST-CO-RTE-PM | 03-YUB,BUT-70-25.5/25.8,0.0/3.8 |
Award Date | 07/15/2021 |
Closeout Date | Not set |
Work Description | WIDEN ROADWAY & SHOULDER, ADD TURN LANES & CONSTRUCT BRIDGE. |
Location Description | YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD |
QA Service Level | 1 (Verified on 05/20/2021) |
Sample Information
Sample Taken Date | 04/12/2022 | Sample Unique Key | 10 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/13/2022 |
Sample type | Quality Assurance | A brief description of the sample | #11 HRC 500/510 Couplers |
The quantity of what the sample constitutes | 150 Couplers | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Hannah | Last name of sampler or witnessed by | Braun |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Pacific Steel Group | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Nucor |
Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | |
Rebar Size | #11 | Coupler Model | HRC 500/510 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | 58047320/05, 58047321/04 | Rebar Heat Number(s) | 3500016789, 3500023194 |
Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2022-04-12-10
DIME Test ID: 2022-04-12-10-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2022-04-15
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 04/13/2022
UTM: 400kip
Temperature: 72.00 f
Halo ID: Small
Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|---|
1 | 1 | No. 11/36mm | 1 | -0.0122 | 1.56 | 143342 | 91886 | ok necking | spaine |
General comments (publicly viewable) (Max 1000 characters): ok necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 4/15/2022 ✔