Summary for Test 2022-01-27-47-1
Test performed: AASHTO T27-14Project Information
Project Identifiers | Project ID: 214451 DEA: 07303704 EFIS: 0714000035 |
---|---|
DIST-CO-RTE-PM | 07-LA-101-8.0/27.3 |
Award Date | 12/19/2019 |
Closeout Date | 05/07/2024 |
Work Description | REPLACE CONCRETE BARRIERS. |
Location Description | THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING |
QA Service Level | 1 (Verified on 08/12/2020) |
Sample Information
Sample Taken Date | 01/27/2022 | Sample Unique Key | 47 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 02/01/2022 |
Sample type | Department Acceptance | A brief description of the sample | 3/4 HMA-A |
The quantity of what the sample constitutes | 100 tons | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Victor | Last name of sampler or witnessed by | Pham |
Title of sampler | Telephone number of sampler | 2137924794 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | AAA-Irwindale | Transportation Laboratory (TL) Number | C-0127C2 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0005 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | 3/4 HMA-SP | The fabricator/manufacturer designation for the sample | 105793 |
The plant number | Irwindale | A detailed description of where the material sample was collected | belt feed |
Where the material sample would have been placed if not sampled | Roadway | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2022-01-27-47
DIME Test ID: 2022-01-27-47-1
Testing Lab: CT D07 - Plant Services
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2022-04-08
Test Results
What type of gradation is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Has the fine aggregate sample been reduced?: No
Input Type: Calculated
Tester's full name: A.Behjati
Date of test: 02/02/2022
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 96 %
Cumulative percent passing the 1/2 in. sieve: 84 %
Cumulative percent passing the 3/8 in. sieve: 68 %
Cumulative percent passing the #4 sieve: 43 %
Cumulative percent passing the #8 sieve: 29 %
Cumulative percent passing the #16 sieve: 20 %
Cumulative percent passing the #30 sieve: 14 %
Cumulative percent passing the #50 sieve: 11 %
Cumulative percent passing the #100 sieve: 7 %
Cumulative percent passing the #200 sieve: 5 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/8/2022 ✔