Summary for Test 2022-03-22-21-3
Test performed: ASTM D5329-16Project Information
Project Identifiers | Project ID: 214951 DEA: 120K0234 EFIS: 1214000100 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-17.1/18.9 |
Award Date | 09/23/2020 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 3 - El Toro/Alicia) WIDEN FREEWAY AND BRIDGES, RECONSTRUCT BRIDGE AND WALLS. |
Location Description | ORANGE COUNTY IN MISSION VIEJO, LAGUNA HILLS, LAGUNA WOODS AND LAKE FOREST FROM 0.4 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING TO 0.2 MILE NORTH OF EL TORO ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 10/01/2020) |
Sample Information
Sample Taken Date | 03/22/2022 | Sample Unique Key | 21 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/24/2022 |
Sample type | Per Request | A brief description of the sample | Asphalt Rubber Binder |
The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
First name of sampler or witnessed by | AAA QC | Last name of sampler or witnessed by | AAA QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0188-22 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | AAA-Irvine | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
---|---|---|---|
Performance Grade | PG 64-16 | Lot number | |
Sublot number | Asphalt Rubber Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2022-03-22-21
DIME Test ID: 2022-03-22-21-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2022-04-11
Test Results
Input Type: Calculated
Tester's full name: Sm Ali
Date of test: 04/07/2022
Temperature: 25 C
Final Dial reading (F1): 74 mm
Ball Penetration (P1): 1 mm
Final Dial reading (F2): 71 mm
Ball Penetration (P2): 0 mm
Final Dial reading (F3): 74 mm
Ball Penetration (P3): 1 mm
Resilience 1: 27 %
Resilience 2: 29 %
Resilience 3: 27 %
Average Resilience: 28 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/11/2022 ✔