Summary for Test 2022-03-16-2-3
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215-2.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA. |
Location Description | SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING |
QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
Sample Taken Date | 03/16/2022 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/21/2022 |
Sample type | Quality Assurance | A brief description of the sample | #7 Rebar |
The quantity of what the sample constitutes | 4 samples from Lot # 1 | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Lorenzo | Last name of sampler or witnessed by | Garcia |
Title of sampler | Telephone number of sampler | 17029172503 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Integrity Rebar Placers | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L115-025-22 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A615 |
Material Grade | 60 | Rebar Manufacturer | CMC |
Coupler Manufacturer | Bar Splice Products | Intermediate Assembler or Fabricator | |
Rebar Size | #7 | Coupler Model | Double Barrel Zap Screwlok |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | 0344 | Rebar Heat Number(s) | 65033264 |
Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2022-03-16-2
DIME Test ID: 2022-03-16-2-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2022-03-24
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 03/22/2022
UTM: 400kip
Temperature: 72 f
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|
1 | 3 | 1 | 7/22mm | 0.6 | 56734.47 | 94557 | Service Splice | bewing |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 3/24/2022 ✔