Summary for Test 2022-01-07-1-5

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date01/07/2022 Sample Unique Key1
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/07/2022
Sample typeAggregate Prequalification Program A brief description of the sample3/4 HMA Type A
The quantity of what the sample constitutesJMF 3 bags From where was the sample collectedJob Site
First name of sampler or witnessed byChristopher Last name of sampler or witnessed byEscobar
Title of sampler Telephone number of sampler2096655586
Laboratory sample identification1514651651 Linked DIME Sample ID
The fabricator/manufacturer/facility nameGranite Construction Vernalis HMA Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix NumberNot set

Test Details

DIME Sample ID: 2022-01-07-1
DIME Test ID: 2022-01-07-1-5
Testing Lab: Granite Construction Company - Tracy
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-01-07

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Chris Escobar
Date of test: 01/04/2022
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.75 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.00 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/7/2022