Summary for Test 2021-10-27-38-1

Test performed: CTM 302-April 2014

Project Information

Project IdentifiersProject ID: 215360
DEA: 112N0454
EFIS: 1118000198
DIST-CO-RTE-PM11-SD-94-30.0/39.0
Award Date02/18/2021
Closeout Date08/02/2022
Work DescriptionPLACING CHIP SEAL, SLURRY SEAL, SHOULDER BACKING AND STRIPING.
Location DescriptionSAN DIEGO COUNTY NEAR DULZURA AND BARRETT JUNCTION FROM 0.9 MILE EAST OF GRANDE CREEK BRIDGE TO ROUTE 188.
QA Service Level1 (Verified on 02/08/2021)

Sample Information

Sample Taken Date10/27/2021 Sample Unique Key38
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/26/2021
Sample typeQuality Control A brief description of the sampleAggregates
The quantity of what the sample constitutes2 bags From where was the sample collectedSource
First name of sampler or witnessed byNot Provided Last name of sampler or witnessed byNot Provided
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCCA Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading1/2 inch Lot number
Sublot number HMA Mix NumberNot set

Test Details

DIME Sample ID: 2021-10-27-38
DIME Test ID: 2021-10-27-38-1
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 302-April 2014: Method of Test for Stripping
Test Release Date: 2022-01-07

Test Results


Using: Paving Grades of Asphalt
Input Type: Calculated
Tester's full name: Daniel Smith
Date of test: 12/23/2021
Asphalt Quantify: 60.1 g
General comments (publicly viewable) (Max 1000 characters): No Stripping

Test was verified on 1/7/2022