Summary for Test 2021-10-19-45-1
Test performed: CTM 557-June 2020Project Information
Project Identifiers | Project ID: 215486 DEA: 040A0204 EFIS: 0400000129 |
---|---|
DIST-CO-RTE-PM | 04-SON-1-15-15.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Construct roadway and bridge with structural concrete and CIDH piling |
Location Description | District-County-Route-Post Mile: 04-Son-1-R15.0/R15.7 |
QA Service Level | 1 (Verified on 04/08/2022) |
Sample Information
Sample Taken Date | 10/19/2021 | Sample Unique Key | 45 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/19/2021 |
Sample type | Quality Control | A brief description of the sample | Concrete |
The quantity of what the sample constitutes | 100 cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Erik | Last name of sampler or witnessed by | Haagensen |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Bridge Way Civil Construction | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 72105003R |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 31393 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Pier 4 right bottom portion | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-10-19-45
DIME Test ID: 2021-10-19-45-1
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2022-03-29
Test Results
Input Type: Calculated
Tester's full name: Erik Haagensen
Date of test: 10/19/2021
Temperature: 71 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/29/2022 ✔