Summary for Test 2020-12-19-6-1
Test performed: AASHTO T27-14Project Information
Project Identifiers | Project ID: 213970 DEA: 080K1214 EFIS: 0815000245 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15-12.5/14.8 |
Award Date | 12/23/2019 |
Closeout Date | 01/18/2022 |
Work Description | REPLACE PCC PAVEMENT WITH JPCP AND PRECAST JOINTED CONCRETE PAVEMENT. |
Location Description | SAN BERNARDINO COUNTY IN FONTANA AND NEAR DEVORE FROM 0.3 MILE SOUTH OF SIERRA AVENUE UNDERCROSSING TO GLEN HELEN PARKWAY UNDERCROSSING |
QA Service Level | 1 (Verified on 12/12/2019) |
Sample Information
Sample Taken Date | 12/19/2020 | Sample Unique Key | 6 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/21/2020 |
Sample type | Quality Assurance | A brief description of the sample | 1 x 4 PCC Aggregate |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Kennedy | Last name of sampler or witnessed by | EuBany |
Title of sampler | Caltrans Consultant | Telephone number of sampler | |
Laboratory sample identification | test 1 300tons out at 2055 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Robertsons Rialto | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-36-0072::REDLANDS WASH PLAN (ROBERTSON'S READY MIX) |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | At the plant | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1-1/2 inch | |
The concrete mix design number | lb0800ab | Lot number | |
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2020-12-19-6
DIME Test ID: 2020-12-19-6-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2021-12-03
Test Results
What type of gradation is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Has the fine aggregate sample been reduced?: No
Input Type: Calculated
Tester's full name: david chen
Date of test: 12/22/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 94 %
Cumulative percent passing the 1 in. sieve: 21 %
Cumulative percent passing the 3/4 in. sieve: 8 %
Cumulative percent passing the 1/2 in. sieve: 0 %
Cumulative percent passing the 3/8 in. sieve: 1 %
Cumulative percent passing the #4 sieve: 9 %
Cumulative percent passing the #8 sieve: 6 %
Cumulative percent passing the #16 sieve: 54 %
Cumulative percent passing the #30 sieve: 36 %
Cumulative percent passing the #50 sieve: 20 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 7 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/3/2021 ✔