Summary for Test 2021-10-27-13-2
Test performed: AASHTO T30-19Project Information
Project Identifiers | Project ID: 215704 DEA: 020J9104 EFIS: 0219000174 |
---|---|
DIST-CO-RTE-PM | 02-LAS,MOD,SHA-89,139,299-VAR |
Award Date | 06/03/2021 |
Closeout Date | 08/08/2022 |
Work Description | REPAIR UNSOUND CONCRETE, POLYESTER CONCRETE OVERLAYS, JOINT SEALS. |
Location Description | LASSEN, MODOC, AND SHASTA COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 05/03/2021) |
Sample Information
Sample Taken Date | 10/27/2021 | Sample Unique Key | 13 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/27/2021 |
Sample type | Acceptance | A brief description of the sample | Lime Treated 3/4-inch Type A Aggregate |
The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Cindy | Last name of sampler or witnessed by | Bryant |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | D78967 | Linked DIME Sample ID | 2021-10-27-10, 2021-10-27-12 |
The fabricator/manufacturer/facility name | JF Shea Construction - Fawndale Rock and Asphalt - Redding, CA | Transportation Laboratory (TL) Number | 875743 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-45-0017 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Mathematically Combined | |
Where the material sample would have been placed if not sampled | 02 MOD LAS SIS SHA VAR | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Lot number | Unknown | |
Sublot number | Unknown | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2021-10-27-13
DIME Test ID: 2021-10-27-13-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-11-18
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Darrell Valasek
Date of test: 11/03/2021
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 87 %
Cumulative percent passing the 3/8 in. sieve: 76 %
Cumulative percent passing the #4 sieve: 53 %
Cumulative percent passing the #8 sieve: 34 %
Cumulative percent passing the #16 sieve: 22 %
Cumulative percent passing the #30 sieve: 15 %
Cumulative percent passing the #50 sieve: 11 %
Cumulative percent passing the #100 sieve: 8 %
Cumulative percent passing the #200 sieve: 6.0 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/18/2021 ✔