Summary for Test 2021-10-26-2-3
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 215164 DEA: 07317304 EFIS: 0715000237 |
---|---|
DIST-CO-RTE-PM | 07-LA-60-0.0/R3.2,11.8/R21.5 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | UPGRADE EXISTING OVERHEAD AND ROADSIDE SIGN PANELS. |
Location Description | LOS ANGELS COUNTY FROM 0.4 MILE WEST OF ROUTE 5/60 SEPARATION TO ROUTE 60/710 SEPARATION AND FROM ROUTE 60/605 SEPARATION TO FAIRWAY DRIVE UNDERCROSSING |
QA Service Level | 1 (Verified on 02/18/2021) |
Sample Information
Sample Taken Date | 10/26/2021 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 11/02/2021 |
Sample type | Quality Assurance | A brief description of the sample | (16) #6 ZAP Coupler |
The quantity of what the sample constitutes | (16) #6 ZAP Coupler | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Rigoberto | Last name of sampler or witnessed by | Marin |
Title of sampler | AMR | Telephone number of sampler | 9515000685 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Camblin Steel Service | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L133-122-21 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Cmc |
Coupler Manufacturer | Single Row ZAP Screwlok Type 2 Series | Intermediate Assembler or Fabricator | Camblin Steel |
Rebar Size | #6 | Coupler Model | Zap Screwlok Type 2 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | 74117560 | Rebar Heat Number(s) | 4111931 |
Rebar Size 2 | 6 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2021-10-26-2
DIME Test ID: 2021-10-26-2-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2021-11-03
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: fsaylor
Date of test: 11/03/2021
UTM: 400kip
Temperature: 72.00 f
Halo ID:
Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|---|
1 | 3 | No. 6/19mm | 1 | 0 | 0.44 | 44279 | 100635 | Service Splice | fsaylor |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 11/3/2021 ✔