Summary for Test 2021-10-04-40-4
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 212496 DEA: 024E4504 EFIS: 0200020286 |
---|---|
DIST-CO-RTE-PM | 02-LAS,MOD-139,299-VAR |
Award Date | 07/28/2020 |
Closeout Date | 08/14/2023 |
Work Description | PLACE HMA, REPLACE DRAINAGE, CULVERT, ELECTRICAL AND LIGHTING SYSTEMS. |
Location Description | LASSEN AND MODOC COUNTIES ON ROUTE 139 AT 0.1 MILE NORTH OF LASSEN COUNTY LINE AND ON ROUTE 299 AT VARIOUS LOCATONS FROM 0.4 MILE WEST OF BOYD HILL LOOKOUT ROAD TO 0.6 MILE EAST OF COUNTY ROAD 87 |
QA Service Level | 1 (Verified on 06/06/2017) |
Sample Information
Sample Taken Date | 10/04/2021 | Sample Unique Key | 40 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/06/2021 |
Sample type | Department Acceptance | A brief description of the sample | 3/4" HMA-A 22 RAP PG 58-34M Albina |
The quantity of what the sample constitutes | 6 boxes at 1620 Tons (43,193 total) | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | E. | Last name of sampler or witnessed by | Chavez |
Title of sampler | Materials Tester | Telephone number of sampler | |
Laboratory sample identification | D78947 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Hat Creek Construction and Materials - Shaw Pit Facility - Lookout, CA | Transportation Laboratory (TL) Number | 854934 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | Unknown |
Sublot number | Unknown | HMA Mix Number | Not set |
Test Details
DIME Sample ID: 2021-10-04-40
DIME Test ID: 2021-10-04-40-4
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2021-10-19
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Terry McCormick
Date of test: 10/06/2021
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.44 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.49 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/19/2021 ✔