Summary for Test 2021-07-14-53-2
Test performed: CTM 226-July 2010Project Information
Project Identifiers | Project ID: 215063 DEA: 032F5704 EFIS: 0300020615 |
---|---|
DIST-CO-RTE-PM | 03-PLA-80-46.3/63.5 |
Award Date | 09/23/2020 |
Closeout Date | 08/11/2023 |
Work Description | Replace 4 Bridges (OC) on Highway 80 from Crystal Springs to Cisco Grove (Baxter, Drum Forebay) |
Location Description | Not set |
QA Service Level | 1 (Verified on 11/16/2020) |
Sample Information
Sample Taken Date | 07/14/2021 | Sample Unique Key | 53 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/14/2021 |
Sample type | Quality Control | A brief description of the sample | Washed Concrete Sand |
The quantity of what the sample constitutes | 1 Day | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Andrew | Last name of sampler or witnessed by | Clarke |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Hansen Bros Enterprises | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Greenhorn |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Stockpile | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | fine | |
The concrete mix design number | 8025P-WDNA | Lot number | |
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2021-07-14-53
DIME Test ID: 2021-07-14-53-2
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 226-July 2010: Method of Test for Determination of Moisture Content of Soils and Aggregates by Oven Drying
Test Release Date: 2022-03-29
Test Results
Input Type: Calculated
Tester's full name: Todd Strait
Date of test: 07/15/2021
Wet weight of the sample: 0.0000000000 grams
Dry weight of the sample: 0.0000000000 grams
Weight of water in sample: 0.0000000000 grams
Percent moisture: 4.6 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/29/2022 ✔