Summary for Test 2015-10-13-12-3
Test performed: ASTM C143-15aProject Information
Project Identifiers | Project ID: 209187 DEA: 04235624 EFIS: 0400000678 COOP: 042583 |
---|---|
DIST-CO-RTE-PM | 04-SCL,SM-101-52.0/52.6,0.0/0.6 |
Award Date | 04/28/2015 |
Closeout Date | 01/08/2020 |
Work Description | BRIDGE REPLACEMENT |
Location Description | SANTA CLARA AND SAN MATEO COUNTIES IN PALO ALTO AND EAST PALO ALTO FROM OREGON EXPRESSWAY OVERCROSSING TO 0.3 MILE SOUTH OF UNIVERSITY AVENUE OVERCROSSING |
QA Service Level | 1 (Verified on 12/11/2013) |
Sample Information
Sample Taken Date | 10/13/2015 | Sample Unique Key | 12 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/14/2015 |
Sample type | Quality Control | A brief description of the sample | 4 EA 6x12 Compression Cylinder |
The quantity of what the sample constitutes | One Sample Every 100 CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Mark | Last name of sampler or witnessed by | Alexander |
Title of sampler | QC Technician | Telephone number of sampler | 5106141044 |
Laboratory sample identification | 150177 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Central Concrete | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 350348 |
Structure name | Bridge Deck |
Material Information
Material Type | Concrete | The concrete mix design number | D15PP562 |
---|---|---|---|
The truck number from where the sample was collected | 1244 | The batch plant ticket number from where the sample was collected | 18106021 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | Truck Chute | Where the material sample would have been placed if not sampled | Bridge Deck |
From Lot No. | Not set | Bag Lot No. | Not set |
Test Details
DIME Sample ID: 2015-10-13-12
DIME Test ID: 2015-10-13-12-3
Testing Lab: Summit Associates
Test Method: ASTM C143-15a: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2016-01-13
Test Results
Input Type: Calculated
Tester's full name: Mark Alexander
Date of test: 10/13/2015
Slump: 4 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/13/2016 ✔