Summary for Test 2021-09-16-33-3

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 215486
DEA: 040A0204
EFIS: 0400000129
DIST-CO-RTE-PM04-SON-1-15-15.7
Award DateNot set
Closeout DateNot set
Work DescriptionConstruct roadway and bridge with structural concrete and CIDH piling
Location DescriptionDistrict-County-Route-Post Mile: 04-Son-1-R15.0/R15.7
QA Service Level1 (Verified on 04/08/2022)

Sample Information

Sample Taken Date09/16/2021 Sample Unique Key33
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/16/2021
Sample typeQuality Control A brief description of the sampleWashed Concrete Sand
The quantity of what the sample constitutes1 Day From where was the sample collectedJob Site
First name of sampler or witnessed byPedro Last name of sampler or witnessed byDe Haro
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameShamrock Concrete Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)::PORT MCNEIL QUARRY(ORCA AGGREGATE)
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Sizefine
The concrete mix design numberSL-4700 Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-09-16-33
DIME Test ID: 2021-09-16-33-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-03-29

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: Todd Strait
Date of test: 09/17/2021
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 42
Sand reading (test 1): 37
Sand equivalent (test 1): 89
Sand equivalent before temperature correction: 89
Sand equivalent after temperature correction: 89
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/29/2022