Summary for Test 2021-06-01-42-3

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 214176
DEA: 033F0904
EFIS: 0312000056
DIST-CO-RTE-PM03-SAC,SJ-5,160-Var
Award Date10/10/2019
Closeout Date10/27/2022
Work DescriptionREPLACE STRUCTURAL CONCRETE BRIDGES, PLACE CIDH & CISS CONCRETE PILES.
Location DescriptionSACRAMENTO COUNTY AT NORTH SACRAMENTO UNDERCROSSING AND SACRAMENTO RIVER BRIDGE AND IN SAN JOAQUIN COUNTY AT MOKELUMNE RIVER BRIDGE
QA Service Level1 (Verified on 05/29/2019)

Sample Information

Sample Taken Date06/01/2021 Sample Unique Key42
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/01/2021
Sample typeQuality Control A brief description of the sampleWashed Concrete Sand
The quantity of what the sample constitutes1 Day From where was the sample collectedJob Site
First name of sampler or witnessed byKristipher Last name of sampler or witnessed byWeaver
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSyar Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)2575
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Sizefine
The concrete mix design numberCT072AR5 Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-06-01-42
DIME Test ID: 2021-06-01-42-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-04-13

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: Todd Strait
Date of test: 06/02/2021
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 53
Sand reading (test 1): 42
Sand equivalent (test 1): 80
Sand equivalent before temperature correction: 80
Sand equivalent after temperature correction: 80
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/13/2022