Summary for Test 2021-09-15-37-3

Test performed: CTM 518-June 2010

Project Information

Project IdentifiersProject ID: 214114
DEA: 040A5394
EFIS: 0418000244
DIST-CO-RTE-PM04-SOL-80,12-11.4/12.8, 2.1/2.8
Award DateNot set
Closeout Date02/24/2023
Work DescriptionWiden EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc.
Location DescriptionI-80/I-680/Route 12 Interchange
QA Service Level1 (Verified on 04/23/2019)

Sample Information

Sample Taken Date09/15/2021 Sample Unique Key37
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/15/2021
Sample typeQuality Control A brief description of the sampleConcrete
The quantity of what the sample constitutes100 CY From where was the sample collectedJob Site
First name of sampler or witnessed byAnthony Last name of sampler or witnessed bySmith
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSyar Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberCT063AC5
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected82837447
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collected1-80 WB under the Lopes Rd overpass Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2021-09-15-37
DIME Test ID: 2021-09-15-37-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2022-03-31

Test Results


Input Type: Calculated
Tester's full name: Anthony Smith
Date of test: 09/15/2021
Unit weight of the concrete: 148.5 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/31/2022