Summary for Test 2021-08-06-37-3
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 212896 DEA: 04160304 EFIS: 0400000429 |
---|---|
DIST-CO-RTE-PM | 04-ALA-84-13.1/13.5 |
Award Date | 12/15/2020 |
Closeout Date | Not set |
Work Description | NILES CANYON ALAMEDA CREEK BRIDGE REPLACEMENT |
Location Description | IN FREMONT, AT ALAMEDA CREEK BRIDGE (BR 33-0036). |
QA Service Level | 1 (Verified on 09/16/2019) |
Sample Information
Sample Taken Date | 08/06/2021 | Sample Unique Key | 37 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/06/2021 |
Sample type | Quality Control | A brief description of the sample | Orca Sand |
The quantity of what the sample constitutes | 1 Day | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Gregory | Last name of sampler or witnessed by | Carr |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Central Ready Mix | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | ::PORT MCNEIL QUARRY(ORCA AGGREGATE) |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | No Information | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | fine | |
The concrete mix design number | DDGPV2Q3 | Lot number | |
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2021-08-06-37
DIME Test ID: 2021-08-06-37-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-04-13
Test Results
Number of tests: 1
Input Type: Calculated
Tester's full name: Todd Strait
Date of test: 08/09/2021
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 42
Sand reading (test 1): 38
Sand equivalent (test 1): 91
Sand equivalent before temperature correction: 91
Sand equivalent after temperature correction: 91
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/13/2022 ✔