Summary for Test 2021-08-20-54-1

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 214114
DEA: 040A5394
EFIS: 0418000244
DIST-CO-RTE-PM04-SOL-80,12-11.4/12.8, 2.1/2.8
Award DateNot set
Closeout Date02/24/2023
Work DescriptionWiden EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc.
Location DescriptionI-80/I-680/Route 12 Interchange
QA Service Level1 (Verified on 04/23/2019)

Sample Information

Sample Taken Date08/20/2021 Sample Unique Key54
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing08/20/2021
Sample typeVerification A brief description of the sample1 Bag of RAP Sampled pt e plant
The quantity of what the sample constitutes1 Bag RAP From where was the sample collectedManufacturer
First name of sampler or witnessed byIgnacio Last name of sampler or witnessed byArechiga
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSYAR Lake Herman Drum Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceLake Herman Quarry
Aggregate Size Aggregate Source
RAP Stockpile Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2021-08-20-54
DIME Test ID: 2021-08-20-54-1
Testing Lab: CT D04 - Hayward DME / District Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-09-22

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Nicholas Shelly
Date of test: 09/08/2021
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 99.2 %
Cumulative percent passing the #4 sieve: 74.8 %
Cumulative percent passing the #8 sieve: 52.9 %
Cumulative percent passing the #16 sieve: 39.1 %
Cumulative percent passing the #30 sieve: 29.9 %
Cumulative percent passing the #50 sieve: 22.3 %
Cumulative percent passing the #100 sieve: 14.7 %
Cumulative percent passing the #200 sieve: 11.1 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/22/2021